ATS Vietnam / Services / Compressed-air leak detection

Your compressor is running to feed leaks nobody can hear

A loose fitting, a cracked hose, a drain valve stuck open: each one small, together a significant part of the compressor's electricity bill every month. Machine noise masks the hiss, so leaks stay for years. ATS finds them with an ultrasonic detector while the plant runs, tags every point and tells you how much money is lost each year.

✓ Detection while the plant runs✓ Every leak tagged✓ No savings, no detection fee

From VND 6,900,000 per day, one plant with up to 2 compressors · additional day VND 4,900,000 · excl. VAT.Fixed price confirmed after a short call about your site; no extras within the agreed scope.

Sample leak listtag, photo, location
TagLocationSizeReplace
#1Upper branch fittingLargeQuick coupler
#2Main-line drain valveMediumDrain valve
#3Cylinder hoseMediumPU hose
#4Blow gun at line endSmallSeal

Illustration of how ATS marks leaks. The real report has a photo of each point and an estimated electricity cost based on the plant's own tariff.

No savings, no detection fee

If the estimated yearly electricity lost to leaks (at the plant's actual tariff) is lower than the detection fee, ATS does not charge the detection fee. The calculation method is stated in the quotation before work starts.

How it works

What a leak-detection day includes

  • Baseline: pressure, compressor loaded hours, electrical power.
  • Ultrasonic detection along pipes, fittings, valves, cylinders and blow guns while the plant runs.
  • Tag and photograph every leak; estimate flow from hole size and pressure.
  • Also checked: is the set pressure higher than needed, does the compressor run unloaded too often.
Result

What you receive

  • One number: electricity cost lost to leaks per year.
  • Leak list with photo, location, size and parts to replace.
  • Repair quotation and an optional re-measurement after repair to prove the result. You may also repair it yourself.
Quick answers

Frequently asked questions

Do we need to stop the machines?

No. Leaks can only be heard properly while the plant runs normally.

Is it worth it for a small plant?

It usually pays off with a compressor of about 15 kW or more running full shifts. For smaller plants, call and an engineer gives a quick estimate before booking.

How often should we re-check?

New leaks appear continuously as machines vibrate and hoses age. Every 6 months is typical.

Are the savings guaranteed?

They are estimates based on leak flow and the plant's tariff. For measured savings, ATS meters the compressor before and after the repairs.

Find out what leaks are costing your plant

Send compressor power and shifts run; an ATS engineer gives a quick estimate before visiting.