ATS Vietnam / Thermal imaging of electrical panels

Find hot spots in your panels before they become failures

A loose lug or an overloaded breaker usually runs hot for weeks before it fails. A thermal camera sees it while the panel is still running. An ATS engineer inspects your panels in one visit with no shutdown, and within 3 working days you have a report to decide what must be fixed first.

✓ No power cut, no line stop✓ Report within 3 working days✓ Inspection fee credited if ATS does the repair

From VND 4,900,000 per visit, up to 10 panels · extra panel VND 450,000 · full day up to 30 panels VND 11,900,000 · excl. VAT.Fixed price confirmed after a short call about your site; no extras within the agreed scope. One free re-scan of the hot spots after repair (within 60 days).

Most plants in Vietnam stop for 1–2 weeks around Lunar New Year (Tet). That shutdown is the easiest time to fix what the inspection finds.

Electrical panel in a factory
To the naked eye the panel looks normal
● RECThermal cameraLoad 82%
Phase A41°C
Phase B76°C
Phase C43°C
30°C80°C

⚠ Phase B is 35°C above the adjacent phase – act now

The thermal image and figures above illustrate how a reading is interpreted; they are not measurements from a specific plant.

Before the shutdown

The holiday shutdown is when electrical work costs no production time

Know what to fix in advance

To replace breakers, re-torque busbars or re-route cables during the break, you need to know now where the problems are, so parts and people can be arranged.

Restart with fewer worries

Weak points are identified and fixed during the break, so the first production day of the year carries less risk.

Evidence for audits

A photo report shows that the plant maintains its electrical system – useful when customers, group EHS teams or insurers visit.

How it works

4 steps, from booking to repairs done during the shutdown

1BookSend your name and phone or Zalo; an engineer calls back to ask about panel count and running hours.
2Scan under loadOne visit: thermal image of every panel, load current recorded at the time, visual check of lugs, busbars, dust and moisture.
3Report in 3 daysVisual + thermal photo of each finding, priority level, likely cause and recommended fix.
4Fix during the breakQuotation and schedule attached. You are free to use any contractor.

Which panels we inspect

  • Main and distribution boards: breakers, busbars, cable lugs.
  • Control panels: contactors, motor starters, VFDs.
  • Power-factor correction panels: swollen or overheating capacitors.
  • Optional: back up PLC/HMI programs and record models and firmware in the same visit.
Sample reportSummary page for management
PointLocationΔTPriority
#1Main breaker – phase B35°CAct now
#2PFC panel – step 314°CDuring shutdown
#3Compressor panel – lug6°CMonitor

Illustrative sample. The real report includes a visual photo, a thermal photo and the load current for every point. Reports are available in English or bilingual English–Vietnamese.

FDI plants

Turn one inspection into a year-round electrical maintenance program

Many US, Japanese and European groups expect their plants to run an electrical maintenance program following NFPA 70B (2023 edition): equipment inventory, condition assessment, periodic thermography and records. The pre-shutdown inspection can be the first step of that program.

  • Bilingual English–Vietnamese records for your EHS team and group auditors.
  • Thermography 2–4 times a year, with temperature rise and load current recorded for every point.
  • Follows NFPA 70B guidance; ATS is not a certification body and does not replace the statutory inspection and testing required by Vietnamese regulations.
Quick answers

Frequently asked questions

Do we need to cut power or stop the machines?

No. Thermal images are only meaningful when the panel is under load, so the engineer inspects while the plant runs normally.

How long does it take?

About 10 panels per half-day visit and about 30 panels per full day, depending on the distance between panels.

How is it priced?

From VND 4,900,000 excl. VAT for up to 10 panels; a fixed price by panel count is confirmed before the visit. If you appoint ATS for the repairs, the inspection fee is credited to that contract.

Is this a statutory electrical safety inspection?

No. It is a condition assessment for maintenance planning. Statutory inspection and periodic testing are carried out by licensed organisations under Vietnamese regulations.

Can the engineer communicate in English?

Yes. Booking, the on-site briefing and the report can be in English; site work follows your permit-to-work and safety rules.

What do we need to prepare?

A guide who knows the panel layout, permission to open panel doors, and normal production running.

Reserve a visit before the Tet shutdown

December and January slots are limited because every visit is carried out and reported by an ATS engineer in person.