A loose lug or an overloaded breaker usually runs hot for weeks before it fails. A thermal camera sees it while the panel is still running. An ATS engineer inspects your panels in one visit with no shutdown, and within 3 working days you have a report to decide what must be fixed first.
From VND 4,900,000 per visit, up to 10 panels · extra panel VND 450,000 · full day up to 30 panels VND 11,900,000 · excl. VAT.Fixed price confirmed after a short call about your site; no extras within the agreed scope. One free re-scan of the hot spots after repair (within 60 days).
Most plants in Vietnam stop for 1–2 weeks around Lunar New Year (Tet). That shutdown is the easiest time to fix what the inspection finds.

⚠ Phase B is 35°C above the adjacent phase – act now
The thermal image and figures above illustrate how a reading is interpreted; they are not measurements from a specific plant.
To replace breakers, re-torque busbars or re-route cables during the break, you need to know now where the problems are, so parts and people can be arranged.
Weak points are identified and fixed during the break, so the first production day of the year carries less risk.
A photo report shows that the plant maintains its electrical system – useful when customers, group EHS teams or insurers visit.
| Point | Location | ΔT | Priority |
|---|---|---|---|
| #1 | Main breaker – phase B | 35°C | Act now |
| #2 | PFC panel – step 3 | 14°C | During shutdown |
| #3 | Compressor panel – lug | 6°C | Monitor |
Illustrative sample. The real report includes a visual photo, a thermal photo and the load current for every point. Reports are available in English or bilingual English–Vietnamese.
Many US, Japanese and European groups expect their plants to run an electrical maintenance program following NFPA 70B (2023 edition): equipment inventory, condition assessment, periodic thermography and records. The pre-shutdown inspection can be the first step of that program.
No. Thermal images are only meaningful when the panel is under load, so the engineer inspects while the plant runs normally.
About 10 panels per half-day visit and about 30 panels per full day, depending on the distance between panels.
From VND 4,900,000 excl. VAT for up to 10 panels; a fixed price by panel count is confirmed before the visit. If you appoint ATS for the repairs, the inspection fee is credited to that contract.
No. It is a condition assessment for maintenance planning. Statutory inspection and periodic testing are carried out by licensed organisations under Vietnamese regulations.
Yes. Booking, the on-site briefing and the report can be in English; site work follows your permit-to-work and safety rules.
A guide who knows the panel layout, permission to open panel doors, and normal production running.
December and January slots are limited because every visit is carried out and reported by an ATS engineer in person.