Enter your plant's figures and see the result immediately. No registration, and your data is not stored.
Planned stops: breaks, meetings, scheduled cleaning. Machine downtime: breakdowns, waiting for material, changeovers, recorded micro-stops. Read the OEE explanation
Formula: Qc = P × (tan φ1 − tan φ2). Current cos φ can be read from a multifunction meter or worked out from the bill (reactive energy).
Defaults are examples for Southern Vietnam, system without battery; investment cost varies by brand, inverter type (micro-inverters are usually higher) and roof.
An ATS engineer measures on site and sends a report as part of the one-day survey package.