PLC programming for Mitsubishi, Siemens, Omron, ABB, Schneider, Beckhoff; HMI/SCADA; replacing old-generation PLCs, IPC-to-PLC migration, servos, drives, conveyors. Tested first at the ATS workshop, installed outside production shifts.
The mechanics of many machines are good for another 10–20 years, but the controller is end-of-life: the PLC is discontinued, the HMI screen is dim, and nobody holds the program. Replacing the control side usually costs only a fraction of a new machine, and the machine runs more stably than before.



Photos taken on site, with customer names and logos removed.
A full inventory of PLCs/HMIs in the plant, program backup, I/O list and a 2–4 year replacement roadmap. Fixed price by number of machines.
Book a PLC inventoryMitsubishi (FX, Q, iQ-R, iQ-F), Siemens (S7-200/300/1200/1500), Omron, ABB, Schneider, Beckhoff and common HMIs (Weintek, Siemens, Mitsubishi, Proface…).
ATS surveys on site, reads the running program (if it is not locked), and redraws the diagram and I/O list before making changes. ATS does not crack PLC passwords.
Most of the work is done beforehand at the ATS workshop. Machine downtime is usually packed into 1–3 days depending on scale, and can be done on a Sunday or holiday.
A fixed-price quotation after the survey, clearly split into equipment, programming, installation and commissioning. No extra hourly charges if the scope does not change.
Drive panels, the OEE data panel and the AMC maintenance plan are listed under Products.
S7-300 has entered its discontinuation phase. Vietnamese plants running S7-300 should take inventory, back up programs, keep spare parts and plan a migration to …
Read · 6 min →OEE & production dataOEE measures how effectively a machine runs: Availability × Performance × Quality. A step-by-step guide with a one-shift example, the 6 big losses and how to capture them …
Read · 7 min →An ATS engineer looks at your machines and panels on site and proposes a step-by-step approach.