ATS Vietnam / Services / Automation & Retrofit

Automation & Retrofit

PLC programming for Mitsubishi, Siemens, Omron, ABB, Schneider, Beckhoff; HMI/SCADA; replacing old-generation PLCs, IPC-to-PLC migration, servos, drives, conveyors. Tested first at the ATS workshop, installed outside production shifts.

When should you retrofit instead of buying a new machine?

The mechanics of many machines are good for another 10–20 years, but the controller is end-of-life: the PLC is discontinued, the HMI screen is dim, and nobody holds the program. Replacing the control side usually costs only a fraction of a new machine, and the machine runs more stably than before.

  • PLC and HMI are discontinued, parts are hard to find and expensive
  • The machine often has micro-stops and faults with no clear cause
  • You want output and downtime data but the old PLC cannot connect
  • You want higher speed, extra safety sensors, extra functions

What ATS does

  • PLC programming: Mitsubishi, Siemens, Omron, ABB, Schneider, Beckhoff
  • HMI / SCADA, safety PLCs, servos, drives
  • Migrating control from IPC to PLC; replacing old-generation PLCs
  • Conveyors, dosing, filling, pallet wrapping, labelling, barcode checking
  • Connecting machine data to OEE / MES / ERP
What retrofit means

Keep the mechanics, replace the controls

BeforeOld-generation controller
  • PLC/IPC discontinued, parts hard to find
  • Nobody holds the program, no drawings
  • No way to get output data
ATS
retrofit
AfterNew PLC/HMI, same old mechanics
  • Common parts, electricians can handle typical faults themselves
  • Program, I/O list and drawings fully handed over
  • Data port ready for OEE / MES / ERP

Photos taken on site, with customer names and logos removed.

Process

A 5-step process with minimum downtime

1SurveyWatch the machine running, back up the program, photograph the panel, build the I/O list.
2DesignSelect the PLC/HMI, panel drawings, conversion and program writing. The customer approves before work starts.
3Test at the ATS workshopFully wire the panel, simulate signals, test each function.
4Install outside shiftsReplace within the agreed machine-stop window, with a plan to revert to the old panel if needed.
5HandoverLoad run, acceptance, hand over program, drawings and electrician guidance.

Done for an FDI paint plant

  • Migrated powder extruder control from IPC to PLC
  • Safety PLC for a grinding machine
  • Servo for a filling line, drives for agitator motors, time–temperature control
  • Automatic pallet wrapping machine, labelling machine with barcode checking
See projects

"Rescue your legacy PLCs" package

A full inventory of PLCs/HMIs in the plant, program backup, I/O list and a 2–4 year replacement roadmap. Fixed price by number of machines.

Book a PLC inventory

Frequently asked questions

Which PLC brands can ATS work with?

Mitsubishi (FX, Q, iQ-R, iQ-F), Siemens (S7-200/300/1200/1500), Omron, ABB, Schneider, Beckhoff and common HMIs (Weintek, Siemens, Mitsubishi, Proface…).

What about machines from foreign suppliers with no documentation left?

ATS surveys on site, reads the running program (if it is not locked), and redraws the diagram and I/O list before making changes. ATS does not crack PLC passwords.

How long is the machine down for a retrofit?

Most of the work is done beforehand at the ATS workshop. Machine downtime is usually packed into 1–3 days depending on scale, and can be done on a Sunday or holiday.

How is the cost calculated?

A fixed-price quotation after the survey, clearly split into equipment, programming, installation and commissioning. No extra hourly charges if the scope does not change.

Related products

See all products →

Drive panels, the OEE data panel and the AMC maintenance plan are listed under Products.

Further reading

Start with a survey

An ATS engineer looks at your machines and panels on site and proposes a step-by-step approach.

Send a message