Choosing an Automatic Transfer Switch (ATS) Panel for Plants and Clinics: 7 Points to Ask

Electrical safety · 6 min read · Updated 09 Nov 2026 · ATS Vietnam engineering team

For clinics, cold storage and plants that run continuously, a few minutes without power can ruin an entire batch. An ATS (Automatic Transfer Switch) panel transfers to the generator automatically when grid power is lost and returns when power is back. Here are the points to ask about when ordering one.

1. Rated current

Size it to the load current to be supplied from the generator (not the whole plant load), plus allowance for expansion. Common ratings: 63A, 100A, 160A, 250A, 400A, 630A and above.

2. Switching device: contactor, MCCB or ACB

  • Contactor: cheap, fast transfer, suited to small to medium loads.
  • Motorised MCCB: switches and protects, common for 100–630A.
  • ACB: for large currents, the plant's main panel.
  • Or a manufacturer's integrated transfer switching equipment (ATSE) – compact, with an interlock built in.

3. 3-pole or 4-pole

Whether the neutral also needs to be switched depends on how the grid and generator systems are earthed. This is a technical decision that needs an engineer to look at the actual diagram, so do not choose by price.

4. Interlock

Mechanical and electrical interlocks are mandatory so that the two sources are never closed at the same time, to avoid back-feeding generator power onto the grid (dangerous for utility linemen) or short-circuiting the sources.

5. Time delays

  • Generator start delay (to ride through flickers of a few seconds).
  • Load transfer delay after the generator voltage and frequency stabilise.
  • Return-to-grid delay once grid power is stable again.
  • Generator cool-down time before shutdown.

6. Voltage and phase-loss monitoring

In many industrial zones, power does not fail completely but sags or loses one phase – motors burn out running on unbalanced phases. The controller should detect voltage sag, phase loss and wrong phase sequence.

7. Remote monitoring and logs

Alerts via Zalo/SMS on grid loss, generator running and failed transfer; keep a log of the number and duration of outages for dealing with the utility and for calculating generator diesel cost.

See ATS Vietnam's standard ATS panel →

For reference only. Work on energised panels requires qualified, safety-trained personnel. ATS inspections do not replace the statutory inspection required for equipment subject to it under Vietnamese regulations.

Frequently asked questions

What is the difference between an ATS panel and an MTS panel?

An ATS panel transfers to the generator automatically when grid power is lost and returns automatically when power is back. An MTS panel is switched by hand: cheaper, but dependent on someone being on duty.

Should an ATS panel be tested regularly?

Yes. Many panels are only tested during a real outage, and that is when they are found faulty. Run a transfer test under load periodically, as part of the generator maintenance plan.

Can an ATS panel send alerts to a phone?

Yes, if a monitoring unit is installed: it reports grid loss, generator running, failed transfer and phase loss via Zalo/SMS and keeps a log.