Without numbers, improvement work tends to chase the most visible fault rather than the most expensive one. Over two weeks, ATS works with your shift leaders to log every stop and every shift's output, then answers three questions: how much is lost, why, and what to fix first. No equipment to install, no impact on production.
ATS has run OEE systems on the filling lines of an FDI paint manufacturer in Binh Duong and Dong Nai since 2020.
From VND 16,900,000 per line, up to 5 machines · additional line in the same round VND 8,900,000 · excl. VAT.Fixed price confirmed after a short call about your site; no extras within the agreed scope.

Figures on the right illustrate how to read the report; they are not results from a specific plant.
OEE = Availability × Performance × Quality. Frequent stops lower availability; running slower than the ideal cycle lowers performance; defects lower quality. Knowing which factor drags OEE down tells you where to act. See also our OEE calculator.
It is good enough to set priorities. Manual logs usually miss short stops under 3 minutes, so real OEE is often lower than the report shows. Automatic data capture can be added later for full accuracy.
About 15 minutes per shift. The sheet only asks for start time, end time and reason for each stop.
The data belongs to the plant. ATS keeps it confidential under the contract terms and uses it only for this report.
From VND 16,900,000 excl. VAT for one line of up to 5 machines; fixed price by number of lines, confirmed before we start. If the plant runs an automated OEE project with ATS within 6 months, the survey fee is credited to that project.
Send the number of lines and products; ATS calls back within one business day.