ATS Vietnam / Services / Machine loss survey

Everyone knows the machine "stops a lot". Few know how many hours a week it costs

Without numbers, improvement work tends to chase the most visible fault rather than the most expensive one. Over two weeks, ATS works with your shift leaders to log every stop and every shift's output, then answers three questions: how much is lost, why, and what to fix first. No equipment to install, no impact on production.

ATS has run OEE systems on the filling lines of an FDI paint manufacturer in Binh Duong and Dong Nai since 2020.

✓ No equipment to install✓ No impact on production✓ About 15 minutes per shift for shift leaders

From VND 16,900,000 per line, up to 5 machines · additional line in the same round VND 8,900,000 · excl. VAT.Fixed price confirmed after a short call about your site; no extras within the agreed scope.

OEE display installed by ATS on a shop floor
An OEE display ATS installed at a plant
OEE = Availability × Performance × Quality
Availability78%
Performance85%
Quality97%
OEE64%≈ 1/3 of machine time lost
Hours lost per week by stop reason
Changeover5.2 h
Cap jams3.1 h
Waiting for material2.4 h

Figures on the right illustrate how to read the report; they are not results from a specific plant.

How it works

Two weeks, four steps

1Day 130-minute meeting with the production manager: pick the machines, agree ideal cycle times and a stop-reason list. Train shift leaders on the log sheet.
2Days 2–14Shift leaders spend about 15 minutes per shift on the log. ATS enters the data and visits twice a week to check sheets and observe at the machine.
3Day 15One-page report and a 45-minute presentation: OEE per machine, hours lost per week, stop reasons ranked by time lost, the 3 actions to take first.
4HandoverExcel file with all data and formulas so the plant can keep tracking, or move to tablet-based tracking.
What we measure

OEE answers: how much is the machine producing compared with what it could?

OEE = Availability × Performance × Quality. Frequent stops lower availability; running slower than the ideal cycle lowers performance; defects lower quality. Knowing which factor drags OEE down tells you where to act. See also our OEE calculator.

Quick answers

Frequently asked questions

Can hand-logged data be trusted?

It is good enough to set priorities. Manual logs usually miss short stops under 3 minutes, so real OEE is often lower than the report shows. Automatic data capture can be added later for full accuracy.

How much extra work for shift leaders?

About 15 minutes per shift. The sheet only asks for start time, end time and reason for each stop.

Is our production data kept confidential?

The data belongs to the plant. ATS keeps it confidential under the contract terms and uses it only for this report.

How is it priced?

From VND 16,900,000 excl. VAT for one line of up to 5 machines; fixed price by number of lines, confirmed before we start. If the plant runs an automated OEE project with ATS within 6 months, the survey fee is credited to that project.

Find out how many hours your line is losing

Send the number of lines and products; ATS calls back within one business day.