ATS Vietnam / Services / OEE / MES & IoT

OEE / MES & IoT

Automatic OEE measurement from PLCs or sensors, downtime reason codes, line-side screens, lightweight MES (production orders, barcode traceability), energy and cold-room monitoring, ERP connection. A 30-day trial on 1 machine.

Know exactly which line stops, for how long and why

Most plants keep an output log, but few know how many units each shift loses to stoppages, slow running or defects. When the machine counts and records by itself, the figure is usually lower than the log – and that is the figure you can actually improve on.

  • OEE by shift, by machine, by product – automatic, no handwriting
  • Top downtime causes, changeover time between moulds/products
  • Power consumption by line and by product
  • Temperature and humidity of warehouses and cold rooms; Zalo alerts when limits are exceeded

Try calculating your plant's OEE →

The system includes

  • Data collection: PLC tags, counting sensors, stack-light readers, Modbus power meters
  • At the line: OEE screen, button/tablet to select the downtime reason
  • Management: shift/daily/monthly reports, Excel export, Zalo alerts
  • Lightweight MES: production orders, batch traceability by barcode
  • ERP connection: output, machine time, consumption – for costing
Why you need traceable numbers

How many hours did the machine run yesterday?

Ask three places and you usually get three answers. None is entirely wrong – each source measures something different. Example: a machine running 3 shifts, 24 hours:

Shift logbook21.5 hours
Recorded by shift hours, minus the stops the team leader remembers to write down. Short stops of a few minutes usually do not make it into the log.
Maintenance software19.9 hours
Only deducts breakdown time that has a repair ticket. Waiting for material, changeovers and staff shortages are not here.
Power meter22.5 hours
Counts every moment the machine is powered, including idling without load or waiting – power on does not mean product out.

After ATS installs sensors and reconciles

17.6 hours

the machine actually ran and produced

Running and producing17.6 hours
Powered but idling, waiting for material2.1 hours
Stopped with a reason (breakdown, changeover, no operator)2.8 hours
Planned stops (shift handover, cleaning)1.5 hours

Source of the figures: product count and status signals from the PLC, energy from Modbus meters, recorded minute by minute; stop reasons selected by the operator at the machine. Click any stop hour to see each individual stop, when it happened and how long it lasted.

Illustrative figures to explain the method, not those of any customer.

Photos taken on site, with customer names and logos removed.

See it live

The OEE screen at the line

Operators and team leaders see shift output, OEE and machine status minute by minute. When a machine stops the bar turns red, and the operator selects the reason on screen with one touch.

  • Green = running · yellow = running slow · red = stopped · grey = planned stop
  • Compared against the shift target in real time
  • Shown on a TV in the plant, a computer or a phone
Downtime analysis

Know how long, why, and where to improve

Downtime is totalled by cause for each machine, line and shift. Looking at just the 3 longest bars tells you where to focus this month: missing material, slow changeovers or electrical faults.

  • Downtime reason codes in Vietnamese, built with team leaders
  • Filter by machine, shift, product, time range
  • Zalo alert when a stop exceeds X minutes
  • Track results before and after each improvement
A system in 4 parts

From machine signal to management report

Automatic collection

An ATS collection box fitted to the machine: reads PLC tags (Mitsubishi, Siemens, Omron, ABB…) or 24VDC inputs from sensors, stack lights and counters. Wi-Fi, LAN or 4G.

Real-time tracking

Output, speed, OEE and machine status on the line-side screen and on managers' phones.

Operators take part

Select the stop reason, add notes and confirm defects right at the machine. The shift target is clearly displayed so the whole team can follow it.

Reports & ERP connection

Shift/daily/monthly reports, Excel export; output and machine time pushed to the ERP for costing and planning.

The figures you will get

MetricMeaningUsed for
OEE, Availability, Performance, QualityWhat % the machine delivers versus its capabilityComparing machines and shifts, tracking improvements
Downtime by causeHow many hours are lost to each reasonChoosing the improvements with the biggest impact
Number of stops, MTBF, MTTRHow often the machine fails, and how fast it is repairedPlanning maintenance and spare parts
Changeover time (mould / product)How long each changeover takesApplying quick changeover (SMED)
Hourly output versus targetWhether the shift is behind or on planAdjusting within the shift
kWh per unitReal energy consumedCutting power bills, energy and emissions reporting

What sets ATS apart: we understand both the machine and production management

Down to the machine

ATS PLC engineers can read tags from several PLC generations on the same line – something pure MES software vendors often have to outsource.

Up to the ERP

People experienced in production management and ERP design the reports, so the data is usable for planning, costing and plant KPIs.

Built with operators

The Vietnamese downtime code set is built with team leaders – at an FDI paint plant it has been refined through 5 versions.

30-day trial on 1 machine

  1. Pick the bottleneck machine, survey the signals
  2. Install the device and configure it within 1 day
  3. Build the downtime code set with team leaders
  4. Show OEE at the line, weekly report
  5. Wrap-up meeting: the 3 biggest losses and improvement proposals

Register for the trial

The trial fee is credited against the contract if you go on to a wider rollout.

Register for the 30-day trial

Frequently asked questions

Do I need to replace machines or PLCs to measure OEE?

No. Data can be taken from your existing PLCs (Mitsubishi, Siemens, Omron, ABB…), or counting sensors and stack-light readers can be added to old machines.

Where is the data stored?

Up to you: a server at the plant or the cloud. FDI plants often choose on-site storage under group policy; the data belongs to the customer.

Can it connect to the ERP we already use?

With most ERPs, yes – through an API, an intermediate database or periodic file export. ATS surveys the ERP before settling the approach.

How do we start small?

A 30-day trial on 1 bottleneck machine: install the device, build the downtime code set, show OEE at the line, and deliver an end-of-period report. Expand only once it proves effective.

Related products

See all products →

OEE data panel, andon board, electronic production board, product-counting IoT, barcode traceability and remote BMS monitoring are listed in the IoT products category.

Further reading

Start with a survey

An ATS engineer looks at your machines and panels on site and proposes a step-by-step approach.

Send a message