ATS Vietnam / One-day factory survey

One-day factory survey: know which risks to fix first

ATS engineers walk every electrical panel and production area in one day, photograph what they find, and return a report with risk levels, immediate actions, a 30-60-90 day roadmap and an estimated repair budget. You know where the money should go first.

✓ 1 day on site, no line stop✓ Photo for every finding✓ Survey fee credited if ATS carries out the work

From VND 8,900,000 per day, plants up to about 3,000 m² · excl. VAT.Fixed price confirmed after a short call about your site; no extras within the agreed scope.

Photos from a real ATS survey (08/2026), used with the client's consent; plant name withheld.

Scope

Six areas covered in one day

We checkElectrical & panels

Main, distribution and PFC panels, cables, earthing, lugs, signs of overheating.

We checkFire risk

Temporary wiring, open panels, combustibles near electrical equipment, fire-fighting equipment.

We checkWorkplace safety

Machine guarding, lockout–tagout (LOTO), walkways, PPE.

We checkWorking environment

Chemicals, oil and water leaks, moisture, plastic dust near electrical equipment.

We check5S & layout

Panel labels, cable management, walkways, housekeeping around machines.

We checkOperations & energy

Production flow, waste, energy-hungry loads, power factor.

A real survey report

PP plastic cup plant, one-day survey

285site photos
20areas and panels
82risk findings
29high-priority items

Key findings

  • Main circuit-breaker support wedged with wood inside the main panel
  • Machine supply cable with scorched insulation from overload
  • Several failed PFC steps, power factor close to the utility penalty threshold
  • Earthing system not meeting protection requirements
  • Large compressed-air receiver overdue for statutory inspection
  • Many panels left open, covered in dust and plastic fibre

The report includes

  • Photo, location, risk level and recommended fix for every finding
  • Priority matrix: severity × likelihood
  • 30-60-90 day roadmap
  • Estimated repair budget by item
  • Phase 2 proposal: load measurement, thermography, equipment inventory
After the survey

From report to work done

What happened at the plant above over 3 months.

1One-day survey08/2026: 82 findings, 7 hot spots, roadmap and budget.
2Phase 1 repairs09/2026: 400 kVAr PFC panel restored, live parts shielded, lugs replaced – work done on Sundays.
3Load measurement9 days, over 17,000 records: root cause of the hot machine cable found.
4OptimisationLocal compensation proposed: power factor from 0.688 to 0.95, current down about 24%.

See the full project → View as slides →

Quick answers

Frequently asked questions

Do we need to stop production?

No. Engineers walk the plant while it runs normally; we only need a guide and permission to open panel doors.

When do we get the report?

One day on site; the report follows within 3 working days, in English or bilingual English–Vietnamese.

How is it priced?

From VND 8,900,000 excl. VAT for plants up to about 3,000 m²; a fixed price by floor area is confirmed before the visit. If you appoint ATS for the follow-up work, the survey fee is credited to that contract.

Is this a statutory inspection?

No. It is a condition survey for maintenance and improvement planning. Equipment subject to statutory inspection is still inspected by licensed organisations; the report lists which equipment needs it.

Book a survey day before the Tet shutdown

Send your name and phone or Zalo; an ATS engineer calls back to agree a date.