ATS Vietnam / Insights / Panel self-check

Self-check your plant's electrical panel in 3 minutes

10 Yes / Not yet questions – you can answer them with one walk around the panel. The result appears right on your device; no need to leave any information.

1. Panel has no burning smell, humming or crackling
2. Voltage and current meters read normally; the 3 phases are close to balanced
3. Panel door closes tightly, no gaps for rodents or insects
4. Panel exhaust fan runs and the dust filter is not clogged
5. Space in front of the panel is clear, no goods blocking access
6. The main panel has been thermally imaged in the past 12 months
7. Capacitors are not swollen or hot; no extra charges on the power bill for low power factor
8. A wiring diagram that matches reality is kept in or next to the panel
9. Terminals have been re-tightened and the panel cleaned in the past 12 months
10. The generator / transfer panel has been load-tested in the past 6 months (if applicable)

This is a self-assessment to help you decide what to prioritise, not a technical conclusion. Do not open a live panel yourself unless you are trained in electrical safety. The result does not replace statutory inspection for equipment that is subject to it.

Want to be sure?