Most panel fires start from a loose connection that heats up gradually over months. In the hot season the temperature inside the panel rises, so the risk rises too. The tables below help plant electricians inspect systematically. You can print this page (Ctrl + P).

⚠ Opening panels, tightening and measuring must be done with power off, tagged and locked out (LOTO), by a qualified person following the plant's electrical safety procedures.

A. Observation while the panel is running

#Check itemOKNotes
1No burning smell, buzzing or crackling☐
2Phase indicator lights and voltage/current meters read normally, 3 phases balanced☐
3Panel door closed tight, gasket in good condition, no gaps for rodents or insects☐
4Panel ventilation fan running, dust filter not clogged☐
5No items or goods blocking the front of the panel☐

B. Thermal imaging (panel under load)

#Check itemOKNotes
6Main breaker lugs and busbars show no abnormal hot spot compared with other phases☐
7Contactors, motor starters and inverters not overheating☐
8Capacitors not swollen, not abnormally hot☐
9Save thermal images for comparison next time☐

C. During a power-off maintenance window

#Check itemOKNotes
10Re-tighten lugs and busbars to the recommended torque☐
11Remove dust with a vacuum or dry air; do not use water☐
12Check conductors: insulation not brittle, cracked or discolored☐
13Check the panel earth conductor is secure☐
14Replace the fan dust filter☐

D. Testing & protective devices

#Check itemOKNotes
15Press the TEST button on the residual current breaker (RCD/RCBO) – the breaker must trip☐
16Surge protective device (SPD) indicator still shows good☐
17ATS transfer panel: test transfer to the generator and back☐

E. Labels & documents

#Check itemOKNotes
18Every breaker is labeled with the load it feeds☐
19Up-to-date electrical drawing kept in the panel or in the technical room☐
20Spare parts on hand: fuses, branch breakers, contactors that often fail☐

Inspector: ............................   Date: ......../......../........   Signature: ................

Book thermal imaging of electrical panels →

For reference only. Work on energised panels requires qualified, safety-trained personnel. ATS inspections do not replace the statutory inspection required for equipment subject to it under Vietnamese regulations.

Frequently asked questions

How often should electrical panels be inspected?

A quick look every week, a detailed inspection every quarter, and thermal imaging and lug tightening at least once a year, with the period before the hot season being the best time.

Why take thermal images while the panel is under load?

A poor contact only heats up when current flows through it. Only when the panel is under load (usually from about 40% load upward) will the hot spot show.

Can plant electricians do this themselves?

Observation and record-keeping, yes. Opening panels, tightening lugs and measuring must be done with power off and following electrical safety procedures, by a qualified person.