ATS Vietnam / Insights / Electrical safety

Outages and voltage dips in industrial parks: how plants prepare

Electrical safety · 3 min read · Updated 25 Nov 2026 · ATS Vietnam engineering team

In May–June 2023, many plants in northern Vietnam were hit by rolling power cuts. According to a World Bank estimate reported by VnExpress, the May–June 2023 outages cost Vietnam about USD 1.4 billion, roughly 0.3% of GDP. To be clear: that crisis was mainly in the North and eased within weeks. But plants in Binh Duong, Dong Nai and Ho Chi Minh City should still prepare, because voltage dips and short outages can come from many other causes.

Lessons from 2023

  • According to the chairman of the Korean Chamber of Business (KoCham) in Vietnam Briefing, some places had cuts of more than 3 days a week, and many factories ran at half capacity.
  • According to JCCI (Japan Chamber of Commerce and Industry), one outage affecting 5 manufacturers in an industrial park caused direct damage of over USD 190,000 (VIR).
  • In March 2024, FDI business chambers including KoCham and JCCI asked the government for stable power supply and advance notice of cuts (The Investor).

What outages and dips damage in a plant

  • Scrapped batches: injection molding, painting, drying, chemical processes caught mid-run.
  • PLCs, HMIs and servers losing programs or data on abrupt shutdown.
  • Motors and drives damaged or tripping when voltage sags and returns.
  • Simultaneous starting current when power returns, which can trip the main breaker or heat weak joints.
  • Cold rooms and clean rooms losing their storage conditions.

Step 1: classify the loads

GroupExamplesApproach
Critical, must not lose powerPLCs, servers, fire protection, cameras, cold rooms, machines mid-batchUPS and/or generator through an ATS panel
Can waitLines that can stop safely, standby compressorsRestart after supply is stable, in sequence
Can be shedSecondary lighting, air-conditioning, auxiliary machinesShed automatically or by hand while on generator so it is not overloaded

Step 2: backup options

OptionUsed forNotes
Generator and automatic transfer switch panelWhole plant or critical load group, longer outagesA few seconds of delay during transfer; must be tested under load
UPSPLCs, servers, control equipmentHolds power only briefly, enough to shut down safely or wait for the generator
Ride-through settings on VFDsLines with many drivesSet according to the manufacturer's guidance and the load
Load sheddingWhen running on generatorNeeds the load list classified in step 1

How to choose panel type, capacity and operating mode is in choosing an automatic transfer switch panel.

Maintaining the generator and ATS panel

Generators and ATS panels tend to fail exactly when needed if they are never tested. Things to put in the maintenance schedule:

  • Monthly test under load: simulate grid loss, check the generator starts, the ATS panel transfers, and it returns when the grid is back.
  • Check fuel, starter battery, coolant and lubricating oil.
  • Check terminations and contacts in the ATS panel; thermally scan while under load.
  • Log every test: transfer time, result, faults if any.

Log events so you have data

When talking to the utility, a plant with data has a stronger voice. Install power meters per machine or per feeder (see the per-machine energy metering service) to record when outages and dips happen, how long they last and which machines were affected. Add the estimated loss, such as scrapped batches or line downtime. This data is also useful when dealing with the insurer.

Restart sequence after power returns

  1. Wait for voltage and frequency to stabilize; do not close in the moment the grid returns.
  2. Check PLCs, servers and control power first.
  3. Close loads in order: small and critical loads first, large motors last and one step at a time.
  4. Review alarms and drive faults and watch current during the first hours.

How ATS helps

ATS designs and builds automatic transfer switch panels, provides per-machine metering and periodic maintenance. If you are not sure where to start, a one-day factory survey helps classify loads and choose a suitable option for the plant. ATS is not a statutory inspection body, and equipment subject to statutory inspection is still inspected by licensed organisations.

For reference only. Work on energised panels requires qualified, safety-trained personnel. ATS inspections do not replace the statutory inspection required for equipment subject to it under Vietnamese regulations.

Frequently asked questions

Do plants in southern Vietnam need to worry about cuts like the 2023 northern ones?

The 2023 shortage was mainly in the North and eased within weeks. Still, voltage dips and short outages from grid faults can happen in any industrial park, so preparing according to how critical each load is remains useful.

If we already have a generator, do we still need an ATS panel?

If you want the generator to start and supply power automatically when the grid fails, without someone switching by hand, you need an automatic transfer switch panel. It also helps avoid back-feeding the grid when mains power returns.

How often should the generator and ATS panel be tested?

Test periodically, for example monthly, and test under real load, not just by running the engine with no load. Record the result of every test so you can track trends.