In May–June 2023, many plants in northern Vietnam were hit by rolling power cuts. According to a World Bank estimate reported by VnExpress, the May–June 2023 outages cost Vietnam about USD 1.4 billion, roughly 0.3% of GDP. To be clear: that crisis was mainly in the North and eased within weeks. But plants in Binh Duong, Dong Nai and Ho Chi Minh City should still prepare, because voltage dips and short outages can come from many other causes.
Lessons from 2023
- According to the chairman of the Korean Chamber of Business (KoCham) in Vietnam Briefing, some places had cuts of more than 3 days a week, and many factories ran at half capacity.
- According to JCCI (Japan Chamber of Commerce and Industry), one outage affecting 5 manufacturers in an industrial park caused direct damage of over USD 190,000 (VIR).
- In March 2024, FDI business chambers including KoCham and JCCI asked the government for stable power supply and advance notice of cuts (The Investor).
What outages and dips damage in a plant
- Scrapped batches: injection molding, painting, drying, chemical processes caught mid-run.
- PLCs, HMIs and servers losing programs or data on abrupt shutdown.
- Motors and drives damaged or tripping when voltage sags and returns.
- Simultaneous starting current when power returns, which can trip the main breaker or heat weak joints.
- Cold rooms and clean rooms losing their storage conditions.
Step 1: classify the loads
| Group | Examples | Approach |
|---|---|---|
| Critical, must not lose power | PLCs, servers, fire protection, cameras, cold rooms, machines mid-batch | UPS and/or generator through an ATS panel |
| Can wait | Lines that can stop safely, standby compressors | Restart after supply is stable, in sequence |
| Can be shed | Secondary lighting, air-conditioning, auxiliary machines | Shed automatically or by hand while on generator so it is not overloaded |
Step 2: backup options
| Option | Used for | Notes |
|---|---|---|
| Generator and automatic transfer switch panel | Whole plant or critical load group, longer outages | A few seconds of delay during transfer; must be tested under load |
| UPS | PLCs, servers, control equipment | Holds power only briefly, enough to shut down safely or wait for the generator |
| Ride-through settings on VFDs | Lines with many drives | Set according to the manufacturer's guidance and the load |
| Load shedding | When running on generator | Needs the load list classified in step 1 |
How to choose panel type, capacity and operating mode is in choosing an automatic transfer switch panel.
Maintaining the generator and ATS panel
Generators and ATS panels tend to fail exactly when needed if they are never tested. Things to put in the maintenance schedule:
- Monthly test under load: simulate grid loss, check the generator starts, the ATS panel transfers, and it returns when the grid is back.
- Check fuel, starter battery, coolant and lubricating oil.
- Check terminations and contacts in the ATS panel; thermally scan while under load.
- Log every test: transfer time, result, faults if any.
Log events so you have data
When talking to the utility, a plant with data has a stronger voice. Install power meters per machine or per feeder (see the per-machine energy metering service) to record when outages and dips happen, how long they last and which machines were affected. Add the estimated loss, such as scrapped batches or line downtime. This data is also useful when dealing with the insurer.
Restart sequence after power returns
- Wait for voltage and frequency to stabilize; do not close in the moment the grid returns.
- Check PLCs, servers and control power first.
- Close loads in order: small and critical loads first, large motors last and one step at a time.
- Review alarms and drive faults and watch current during the first hours.
How ATS helps
ATS designs and builds automatic transfer switch panels, provides per-machine metering and periodic maintenance. If you are not sure where to start, a one-day factory survey helps classify loads and choose a suitable option for the plant. ATS is not a statutory inspection body, and equipment subject to statutory inspection is still inspected by licensed organisations.