Know which machines and areas use the most power; get energy and emissions data for international buyers.
Quote within 24 hours
Options: Up to 10 metering points · 10–30 metering points · Over 30 metering points
Lead time: Survey within 1 week. Fixed price confirmed before work; no extras within the agreed scope. Suitable for: Export factories asked by customers for energy and carbon data; facilities required to manage energy.
An ATS engineer surveys electrical panels, loads and power quality, then delivers a risk report and energy-saving opportunities.
From VND 8,900,000 / day, factory up to about 3,000 m² · excl. VAT →Know how many hours a line loses each week, why, and which 3 fixes to make first – no equipment installation needed.
From VND 16,900,000 / line, up to 5 machines · excl. VAT →Find and tag every compressed-air leak, and calculate the electricity cost lost each year. If the savings do not cover it, no detection fee is charged.
From VND 6,900,000 / day, up to 2 compressors · excl. VAT →