Team leaders tap the downtime reason right at the machine, and managers see OEE every day. Rented monthly, up and running within 2 weeks.
Quote within 24 hours
Options: Up to 5 machines · 6–20 machines · Over 20 machines
Lead time: Up and running within 2 weeks. Fixed price confirmed before work; no extras within the agreed scope. Suitable for: Plants that have done a machine loss survey and want continuous tracking.
An ATS engineer surveys electrical panels, loads and power quality, then delivers a risk report and energy-saving opportunities.
From VND 8,900,000 / day, factory up to about 3,000 m² · excl. VAT →Know how many hours a line loses each week, why, and which 3 fixes to make first – no equipment installation needed.
From VND 16,900,000 / line, up to 5 machines · excl. VAT →Find and tag every compressed-air leak, and calculate the electricity cost lost each year. If the savings do not cover it, no detection fee is charged.
From VND 6,900,000 / day, up to 2 compressors · excl. VAT →